KING GEORGES ROAD INTERCHANGE UPGRADE

Sydney, NSW

Bored Piles

Project Description
The $130 million upgrade, which is being delivered as part of WestConnex, includes widening and extending the eastbound on-ramp and westbound off-ramp between King Georges Road and the M5 East, increasing ramp lengths by 180 metres in order to ease one of Sydney’s most congested interchanges.
Solutions

AFS Bachy Soletanche used specialist drilling tools and adjusted the Soilmec rigs in order to be able to use them to drill the higher strength rock. Detailed planning and sequencing by the site team was required due to the limited access provided on site and several mobilisations around live traffic and a dense residential area. The piling team worked carefully and diligently adjacent to neighbouring properties, often operating within 3 meters of the boundaries.

Road

WestConnex

AECOM

Date

Client

Industry

Engineer

September 2015 - January 2016

VIEW OTHER PROJECTS

GET IN TOUCH

We'd love to hear from you

+61 2 9814 2990

Want to get
in touch?

Bachy Soletanche

Bachy Soletanche Australia provides high quality, efficient, and cost-effective foundation solutions to the building and engineering industries. We help clients develop scehemes and achieve cost efficiencies. Techniques offered include Large Diameter Piling, Contiguouys and Secant Piled Walls, Diaphragm Walls, CFA Piling, Rotary Displacement Piling, Grouting, and Ground Anchors.

Head Office
Level 5, 13-15 Lyonpark Road, Macquarie Park NSW 2113
T +61 2 9814 2990

© 2019 Bachy Soletanche Australia. Part of the Soletanche Freyssinet Group

  • LinkedIn