MERITON APARTMENTS BASEMENT
Rosebury, NSW
CFA Piles, Anchors


Project Description
The project required a large shoring wall to construct a one level basement for a set of residential apartments in Rosebery. The shoring wall consisted of 400 number 600mm diameter CFA piles with 28 number anchors along the Eastern Wall and a shotcrete finish all around for an aesthetic appeal.
Solutions
CFA piling technique was utilised to install the piles on site due to the geotechnical conditions present. This provided for very high production rates of around 180 lineal metres per day of pile installation.