8 PHILLIP STREET, PARRAMATTA (8PS)

Parramatta City

Plunge Column in Bored Piles

8 PHILLIP STREET, PARRAMATTA (8PS)
Plunge Column in Bored Piles
Bachy Soletanche Australia is providing a complete design and construction retaining wall & foundation solution for a 55-storey building in the heart of Parramatta City
The package includes a shoring wall and plunge columns to underpin a heritage rated church in the middle of the construction site drilled through a pre-stressed concrete slab.  Large diameter bored piles for founding the tower core into the sandstone bedrock were also be constructed.

The next phase of construction will see deep excavation works which will be supported by 4 levels of anchoring and propping designed and built by BSA.

Our teams did tremendous work with support of our client MNB.  Together we continue to progress with safety and quality at the front of our operation.
Project Description
Bachy Soletanche Australia is providing a complete design and construction retaining wall & foundation solution for a 55-storey building in the heart of Parramatta City
The package includes a shoring wall and plunge columns to underpin a heritage rated church in the middle of the construction site drilled through a pre-stressed concrete slab. Large diameter bored piles for founding the tower core into the sandstone bedrock were also be constructed.

The next phase of construction will see deep excavation works which will be supported by 4 levels of anchoring and propping designed and built by BSA.

Our teams did tremendous work with support of our client MNB. Together we continue to progress with safety and quality at the front of our operation.
Solutions

Design and Construction of secant pile retaining wall with temporary anchors and propping. Installation of large diameter piles with concrete and filling material, along with the precise installation of HEB steel plunge columns using a special centraliser frame. Installation of large diameter tower foundation piles in the line of the shoring wall to depths of 36m with extremely heavy reinforcing cages.


Key figures of the project:

263 secant piles for the shoring wall

Six plunge columns down to 35m depth

Eight tower foundation piles with a 1500mm diameter up to 36m depth

More than 200 anchors in four levels

Propping up to 14m span

Industry

Building

Client

MN Builders

Date

May 2020 – December 2021

Engineer

Bachy Soletanche Australia

VIEW OTHER PROJECTS

GET IN TOUCH

We'd love to hear from you

  • LinkedIn
logo_edited.png

Bachy Soletanche Australia

Head Office
Level 5, 13-15 Lyonpark Road, Macquarie Park NSW 2113
T +61 2 9814 2990

© 2019 Bachy Soletanche Australia. Part of the Soletanche Freyssinet Group

  • LinkedIn
bottom of page