Project Description
BSA installed 306 bored piles to support 13 bridges on the Princes Highway. A team effort between Fulton Hogan and BSA to ensure minimal disruption while working within low head room and sensitive aviation areas. At times BSA had 3 state of the art piling rigs working in parallel drilling through high strength sandstone.
Solutions
Construction of temporary and permanent cased bored piles for 13 bridges.
Key figures for the project:
Temporary cased bored piles for 6 x Bridges – Average length 24m-28m
Temporary left in place Bored piles for 7 x Bridges – Average length 12m – 30m.
Pile diameter: 750mm, 900mm, 1050mm, 1200mm
Cross Hole Sonic Logging Tests: 55 Piles
Industry
Rail
Client
Fulton Hogan
Date
May 2019 – June 2020
Engineer
SMEC