BSA installed 306 bored piles to support 13 bridges on the Princes Highway. A team effort between Fulton Hogan and BSA to ensure minimal disruption while working within low head room and sensitive aviation areas. At times BSA had 3 state of the art piling rigs working in parallel drilling through high strength sandstone.
Project Description
BSA installed 306 bored piles to support 13 bridges on the Princes Highway. A team effort between Fulton Hogan and BSA to ensure minimal disruption while working within low head room and sensitive aviation areas. At times BSA had 3 state of the art piling rigs working in parallel drilling through high strength sandstone.
Solutions

Construction of temporary and permanent cased bored piles for 13 bridges.


Key figures for the project:

Temporary cased bored piles for 6 x Bridges – Average length 24m-28m


Temporary left in place Bored piles for 7 x Bridges – Average length 12m – 30m.


Pile diameter: 750mm, 900mm, 1050mm, 1200mm

Cross Hole Sonic Logging Tests: 55 Piles

Industry

Rail

Client

Fulton Hogan

Date

May 2019 – June 2020

Engineer

SMEC