BERRY TO BOMADERRY BYPASS

Bored Piles

BERRY TO BOMADERRY BYPASS
Bored Piles
Great to be involved on another TfNSW project - BSA installed 261 nos. permanently cased bored piles to support 11 Super T and Plank bridges as part of the Berry to Bomaderry bypass. The project was delivered in three stages and over the period of 2 years.
BSA engaged Leibherr LB28 piling rig to drill very high strength sandstone.
Project Description
Great to be involved on another TfNSW project - BSA installed 261 nos. permanently cased bored piles to support 11 Super T and Plank bridges as part of the Berry to Bomaderry bypass. The project was delivered in three stages and over the period of 2 years.
BSA engaged Leibherr LB28 piling rig to drill very high strength sandstone.
Solutions

Construction of permanent cased bored piles for 11 bridges.

Key figures for the project:

Permanently cased bored piles for 11 x Bridges – Average length 10m-20m

Pile diameter: 900mm, 1050mm, 1200mm

Cross Hole Sonic Logging

Industry

Road

Client

Downer Seymour Whyte Joint Venture (DSWJV)

Date

Sep 2018 – Feb 2021

Engineer

SMEC