SYDNEY FOOTBALL STADIUM (SFS)
Sydney, NSW
Bored Piles
Project Description
Bachy Soletanche Australia was proud to be appointed the piling contractor for the new Sydney Football Stadium. We had four piling rigs and one anchoring machine working simultaneously to install the foundations for Sydney’s next world-class sporting and entertainment venue.
BSA provided a complete Design and Construct solution incorporating approximately 1500 CFA piles drilled through sand to found in bedrock to maximum depths of 33m. Pile integrity and dynamic load testing was conducted to successfully verify our design and construction methods.
A team effort with clients John Holland and the NSW Government ensured the safe and timely delivery of the foundations on multiple work fronts.
Solutions
Design and Construction of CFA foundation and contiguous pile retaining wall with temporary soil anchors.
Key figures for the project:
More than 20 km continuous flight auger (CFA) piles drilled
More than 10.000 cubic metre concrete placed
Maximum pile diameter: 900mm
Maximum pile depth: 33m
Industry
Infrastracture, Spoting Venue
Client
John Holland Group
Date
May 2020 - November 2020
Engineer
Aurecon