SYDNEY METRO

Sydney, NSW

Plunge Column in Bored Piles

SYDNEY METRO
Plunge Column in Bored Piles
Bachy Soletanche Australia has been appointed the role of piling contractor as part of a $955 million contract with Sydney Metro to improve the busiest transport hub in Australia. Bachy Soletanche Australia (BSA) will be installing 279 Bored Piles and 42 Plunge Columns at Sydney Metro, Australia’s busiest transport hub.
Project Description
Bachy Soletanche Australia has been appointed the role of piling contractor as part of a $955 million contract with Sydney Metro to improve the busiest transport hub in Australia. Bachy Soletanche Australia (BSA) will be installing 279 Bored Piles and 42 Plunge Columns at Sydney Metro, Australia’s busiest transport hub.
Solutions

Temporary works design, manufacture and fabrication of plunge column frame.

 

Key requirements for the project:

  • Verticality: 1 in 250

  • Positional tolerance: 20mm

  • Rotational: 2deg >3.5m below platform level

  • Plunge column lengths up to 27.0m

  • Incorporation of plunge column pile cages

  • Tight installation tolerances for cages and columns

  • Working adjacent to a live railway station

Industry

Rail

Client

Transport for NSW

Date

December 2018

Engineer